Jiugang the No. 1 BF Long-term Damping Down Dealted Restoration Practices

This article summarizes the jisco blast furnace no. 1, August 16, 2016, 38 hours after damping down for a long time, in the restoration process of turnaee condition, because outside the original fuel change not in time, and adjust the relative lag in furnace, can lead to drum pneumatic severity shortage, a significant reduction in the hearth breathable liquid permeability, hearth local appear not to live, in furnace through a variety of measures, after adjusting for turnace condition gradually returned to normal.